[1]
“Toward Proving the Extension of Johnson’s Rule to a Three-Machine Flow Shop Scheduling Problem”, Tikrit j. eng. sci., vol. 32, no. SP1, pp. 1–10, Dec. 2025, doi: 10.25130/tjes.sp1.2025.48.