[1]
2025. Toward Proving the Extension of Johnson’s Rule to a Three-Machine Flow Shop Scheduling Problem. Tikrit Journal of Engineering Sciences. 32, SP1 (Dec. 2025), 1–10. DOI:https://doi.org/10.25130/tjes.sp1.2025.48.